CPWD DSR 2023 · Maharashtra SSR · MJP SSR 2023–24

Your project cost,
backed by DSR.
In under a minute.

The average site estimate takes 4+ hours of spreadsheet work. Type your project below and see the number in 30 seconds — quantities calculated, DSR rates looked up, Excel ready to download.

No DSR knowledge required. No setup. Just describe what you're building.

5 free estimates · no signup · no credit cardFor construction firms →
EstimatorFinderAnalysercivimetric.in/app
P
3BHK house 1100 sqft, Nagpur
Estimated Cost Range₹38 – 44 L
Nagpur · 3BHK · 1,100 sqft · Full House · CPWD DSR 2023
Foundation & PCC
₹4.1 LCPWD 5.1
RCC Work (M20)
₹9.4 LCPWD 5.22
Brick Masonry
₹5.0 LCPWD 6.1
Plastering & Finishes
₹4.2 LCPWD 13.3
Electrical & Plumbing
₹3.8 LIS:732
+ Maintenance · BBS · Excel Export↓ Download BOQ
Workflow

From description to BOQ in three steps

edit_note
01

Describe your project

Type naturally — project type, area, location. No forms, no drop-downs. "G+2 commercial 4000 sqft Pune" is enough.

Works with residential, commercial, industrial, flat renovations, and compound walls.

menu_book
02

Civimetric reads the DSR

Quantities are calculated using IS-code formulas. Rates come from the applicable CPWD or state SSR schedule — not guessed.

Every line item carries the DSR item number and source document so it's fully auditable.

table_chart
03

Download your BOQ

Export a 10-sheet Excel workbook: full BOQ, measurement book, BBS, DSR references, and a 10-year maintenance plan.

Ready for client submission or tender preparation.

Rate Sources

Every rate has a source.

No rate is invented. Every number traces back to a specific item number in a published government schedule. When you download your estimate, the DSR reference is right there in the Excel — column D, every row.

We currently cover CPWD and major Maharashtra schedules. If your state isn't listed, the CPWD DSR fallback still gives you a defensible baseline for tender submissions.

Central
CPWD DSR 2023
Civil Works Vol. 1 & 2
2,400+ items
Delhi
Delhi E-DSR 2026
CPWD Delhi Circle
1,800+ items
Maharashtra
Maharashtra SSR
PWD 2020–21
3,200+ items
Water Works
MJP SSR 2023–24
Maharashtra Jal Project
900+ items
Irrigation
WRD CSR 2022–23
Water Resources Dept.
700+ items
Q3 2026
More States
Karnataka · Rajasthan · UP
In progress
Tools

Four tools. One workflow.

Whether you're scoping a new project, verifying a contractor's quote, comparing tenders, or doing a full BOQ review — there's a tool for each step.

calculate
THE ESTIMATOR

Get a full cost estimate from a description.

Tell Civimetric what you're building — construction type, area, location. It calculates quantities using IS-code formulas and prices every line item against DSR. Done in under a minute.

  • checkResidential, commercial, industrial, flat, compound wall
  • checkIS:456 quantities · CPWD/SSR rates · location multiplier
  • check10-sheet Excel: BOQ, BBS, maintenance, DSR references
Try Estimator
search
THE FINDER

Look up any DSR or SSR rate instantly.

Ask in plain English. "RCC M25 slab rate Maharashtra" returns the exact item, unit, rate, and DSR item number — not a list of guesses. Use it to verify quotes or spot-check a BOQ.

  • checkSemantic search across CPWD DSR and state SSRs
  • checkReturns DSR item number + source document
  • checkWorks for material rates, labour rates, sub-head items
Try Finder
fact_check
THE ANALYSER

Upload a BOQ and see where it's overpriced.

Upload an existing estimate or contractor quote (Excel or PDF). Civimetric cross-references every line item against DSR rates and flags items that are significantly above or below the schedule.

  • checkAccepts Excel BOQ or PDF estimate
  • checkVariance % shown per line item vs. DSR rate
  • checkFlagged items exported to a two-sheet Excel summary
Try Analyser
analytics
THE COMPARE

Compare two contractor BOQs side by side.

Upload Contractor A and Contractor B's quotes. Get a line-by-line DSR variance table, a winner recommendation, and the exact rupee savings — no spreadsheet gymnastics required.

  • checkAligns items across both BOQs automatically
  • checkDSR benchmark rate on every matched line item
  • checkRecommendation + Excel export included
Try Compare
Enterprise

Built for firms that run multiple projects at once.

Upload your organisation's rate schedule once. Every estimate your team runs uses those rates first, falling back to CPWD DSR automatically. See variance across every active project on one screen.

check_circle
Org Rate LibraryUpload your company SSR or state-specific schedule. Permanent, versioned.
check_circle
Project PortfoliosAll estimates, BOQ analyses, and bills grouped by project. Every revision tracked.
check_circle
Cross-Project AuditVariance vs DSR across all your projects in one table. Spot outliers before they hit the bill.
check_circle
RA Bill GenerationRunning Account bills with retention, TDS, advance recovery — straight from approved progress entries.
Explore Enterprise
Cross-Project AuditLive
Residential Block A₹1.4 Cr+18.2%
Office Tower Fit-Out₹88 L+6.1%
Compound Wall Phase 2₹12 L+1.3%
3BHK Row Houses₹3.2 Cr–2.4%
Industrial Shed₹67 L+22.5%
vs. CPWD DSR 20235 active projects
Recently Shipped

Roadmap

All three are live — try them now.

Live ✓
engineering

Architectural Plan Parser

Upload your DXF or PDF floor plan. Civimetric extracts room areas, identifies structural elements, and generates a full BOQ automatically.

Sample output · plan.dxf · 58 sqm
HALL24 sqm
BEDROOM18 sqm
KIT12 sqm
WC4 sqm
←── 12.2 m ──→
Extracted
Hall · 24 sqm
BR · 18 sqm
Kit · 12 sqm
WC · 4 sqm
47 BOQ items
Try it →
Live ✓
space_dashboard

AI Floor Plan Generator

Describe your plot — dimensions, BHK, pincode. Get multiple ranked floor plans with vastu compliance, NBC setback checks, and FSI verification. Download as DXF for your architect to edit.

Sample output · 3BHK · 40 × 30 ft
LIVING ROOM18′ × 15′
KITCHEN10′ × 10′
DINING12′ × 12′
MASTER BR14′ × 12′
BEDROOM 212′ × 10′
BEDROOM 311′ × 10′
↑ N
Vastu 84%NBC ✓
Try it →
Live ✓
analytics

Tender Comparison

Upload two contractor BOQs. Get a side-by-side DSR variance comparison, item by item — with a winner recommendation and Excel export.

Sample · 2 contractors vs DSR
ItemABΔ DSR
RCC M20 slab₹4,200₹3,850+9%
Brick masonry₹280₹310+4%
Plastering₹65₹72+11%
Foundation₹3,100₹2,980+2%
TMT Fe500₹78₹81+5%
A vs DSR: +12.4%B vs DSR: +5.2%
Try it →

Just type your project.

See your cost in 30 seconds. If the numbers look right, you've found your estimation tool.

5 free estimates · no signup needed

Already have an account? Sign in for unlimited access